Multi-purpose hall, Berg
Around 750 m2 of glass façade was fitted in this hall. The design of the surrounding aluminium transom-mullion system had to take the static movements of the steel construction into account. The 3-layer insulating glazing was constructed in modules. The lower mullion was embedded directly behind the concrete module, making it invisible from inside. The entire façade can be shaded using external blinds.
Architect
Wepfer und Kreis Architekten
-